• s1ns
  • sns2
  • sns3

Short Lead Time for Seamless Steel Tube - UHP tubes – Dextube

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We now have our individual sales group, layout team, technical team, QC crew and package group. Now we have strict high-quality control procedures for each procedure. Also, all of our workers are experienced in printing discipline for Stainless Steel U Tubes , Thin Wall Steel Tubing , 316 Heat Exchanger Tube , Welcome to visit our company and factory. Please feel free to get in touch with us if you need any further assistance.
Short Lead Time for Seamless Steel Tube - UHP tubes – Dextube Detail:

Product Details:

Process Method: Cold Drawn / Cold Roll& Bright Annealed & Electro polished

Available Material:

TP304L, TP316L, TP316L-S2, EN 1.4301, EN 1.4404, EN 1.4435, other grades can be offered on request.

Elements 304L 316L 316L-S2
( C ) Carbon – max 0.035 0.035 0.035
(Mn) Manganese-max 2.00 2.00 2.00
(P) Phosphorus-max 0.045 0.045 0.045
(S) Sulphur 0.03 0.03 0.005-0.012
(Si) Silicon-max 1 1 1
(Ni) Nickel 8.0-12.0 10.0-14.0 10.0-14.0
(Cr) Chromium 18.0-20.0 16.0-18.0 16.0-18.0
(Mo) Molybdenum N/A 2.0-3.0 2.0-3.0

 Standards: ASTM A269, EN 10216-5 TC1

Outside diameter range from 6.35-50.8mm

Wall thickness range from 0.71-2.77mm

Inner surface roughness can be according to customers’ request and reach up to Ra<0.2μm  

 

Applicable industries:

Semiconductor, TFT/LCD,

Gas/Bio/Medical Equipment

 

Features:

Selected Raw Materials:Our tubes are manufactured from specially selected mother pipes, controlled lower content of sulfur levels to promote reliable, consistent welding.

Chemically And Ultra High Purity/UHP Cleaned: Our tubes are chemically cleaned and passivated to keep nonvolatile residue levels to comply with ASTM G93 or SEMI E 49.6. UHP tubes &pipes are rinsed with 18MΩ cm2 DI hot water and purged with 99.9995% filtered nitrogen and are packed in an class 10 clean room.

Traceability and Clean Packaging: Each tube is marked to identify manufacturer, material type and heat code. BA&EP grade tubes & pipes are packed as following manner: ends are faced and protected with polyamide nylon film and polyethylene caps, packed in single (BA grade) or double (EP grade) polyethylene bags.

Professional Inspection Equipment: We have a variety of professional inspection equipment: Scanning Electron Microscope(SEM),Energy Dispersive Spectroscopy(EDS), Surface Roughness Gauge, Particle Counter, Micro Vickers, Moisture Analyzer, Metallographic Microscope, Tensile Testing Machine etc.


Product detail pictures:

Short Lead Time for Seamless Steel Tube -
 UHP tubes – Dextube detail pictures

Short Lead Time for Seamless Steel Tube -
 UHP tubes – Dextube detail pictures

Short Lead Time for Seamless Steel Tube -
 UHP tubes – Dextube detail pictures


Related Product Guide:
New Jandy Pro Series JXi Pool Heater from Zodiac Pool Systems Boasts Major Improvements to Design and Efficiency | Stainless Steel Bending Tube
Cannell Capital LLC Sells 13,103 Shares of Steel Partners Holdings LP (SPLP) | Heat Exchanger Stainless Steel Coil Tube

We constantly think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body along with the living for Short Lead Time for Seamless Steel Tube - UHP tubes – Dextube, The product will supply to all over the world, such as: Belize , Niger , Costa Rica , By adhering to the principle of "human oriented, winning by quality", our company sincerely welcomes merchants from at home and abroad to visit us, talk business with us and jointly create a brilliant future.
  • Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Andy from Ottawa - 2015.12.30 10:21
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Penelope from Slovakia - 2015.10.09 19:07